Control panel with 1.8 m cable length, 1.5 m cable length between the Vacuum module and the Electronic module, Fully configurable I/O interface (37 pins D-Sub), with live status visible on the Control panel, USB and RS-232 available as serial interfaces, Restricted access to the settings menu to avoid any wrong manipulation while the system is in operation, Universal voltage, no possible mistake whatever the country where the leak detection system is prepared and installed, High helium pumping speed for optimized response time
Control panel with 1.8 m cable length, 1.5 m cable length between the Vacuum module and the Electronic module, Profinet communication, Basic I/O interface (15 pins D-Sub), Restricted access to the settings menu to avoid any wrong manipulation while the system is in operation, Universal voltage, no possible mistake whatever the country where the leak detection system is prepared and installed, High helium pumping speed for optimized response time
Control panel with 1.8 m cable length, 3.5 m cable length between the Vacuum module and the Electronic module, Sniffing option allowing high admissible flow and multi probes set-up, Fully configurable I/O interface (37 pins D-Sub), with live status visible on the Control panel, Ethernet, USB and RS-232 available as serial interfaces, Restricted access to the settings menu to avoid any wrong manipulation while the system is in operation, Universal voltage, no possible mistake whatever the country where the leak detection system is prepared and installed, High helium pumping speed for optimized response time
Control panel with 1.8 m cable length, 3.5 m cable length between the Vacuum module and the Electronic module, Sniffing option allowing high admissible flow and multi probes set-up, Profibus communication, Basic I/O interface (15 pins D-Sub), Restricted access to the settings menu to avoid any wrong manipulation while the system is in operation, Universal voltage, no possible mistake whatever the country where the leak detection system is prepared and installed
Control panel with 1.8 m cable length, 5 m cable length between the Vacuum module and the Electronic module, Fully configurable I/O interface (37 pins D-Sub), with live status visible on the Control panel, Ethernet, USB and RS-232 available as serial interfaces, Restricted access to the settings menu to avoid any wrong manipulation while the system is in operation, Universal voltage, no possible mistake whatever the country where the leak detection system is prepared and installed, High helium pumping speed for optimized response time
Control panel with 5 m cable length, 3.5 m cable length between the Vacuum module and the Electronic module, Fully configurable I/O interface (37 pins D-Sub), with live status visible on the Control panel, USB and RS-232 available as serial interfaces, Restricted access to the settings menu to avoid any wrong manipulation while the system is in operation, Universal voltage, no possible mistake whatever the country where the leak detection system is prepared and installed, High helium pumping speed for optimized response time
Control panel with 5 m cable length, 3.5 m cable length between the Vacuum module and the Electronic module, Profinet communication, Basic I/O interface (15 pins D-Sub), Restricted access to the settings menu to avoid any wrong manipulation while the system is in operation, Universal voltage, no possible mistake whatever the country where the leak detection system is prepared and installed, High helium pumping speed for optimized response time
Control panel with 5 m cable length, 5 m cable length between the Vacuum module and the Electronic module, Profibus communication, Basic I/O interface (15 pins D-Sub), Restricted access to the settings menu to avoid any wrong manipulation while the system is in operation, Universal voltage, no possible mistake whatever the country where the leak detection system is prepared and installed, High helium pumping speed for optimized response time
Don't worry we won't leave you in a vacuum