TCS 17 for control of backing pumps

  • For connection to TC 110/120
  • Direct control of ACP backing pump (M12 socket)
  • Indirect control of Duo and Pascal backing pumps via additional relay box (M12 socket)
  • For time-delayed triggering of a fore-vacuum safety valve (M8 socket)
  • Control cable (M8 and M12) and relay box are not in scope of delivery

  • For connection to TC 110/120
  • Direct control of ACP backing pump (M12 socket)
  • Indirect control of Duo and Pascal backing pumps via additional relay box (M12 socket)
  • For time-delayed triggering of a fore-vacuum safety valve (M8 socket)
  • Control cable (M8 and M12) and relay box are not in scope of delivery